VVietpeep
Latest
← Back to home
Getting AroundCentral Vietnam

Vietnam Trains in Storm Season: Reunification Express SE4 Hanoi to Da Nang, 26-27 September 2026

A dated field report on riding SE4 of the Reunification Express from Hanoi to Da Nang on 26 and 27 September 2026, during central Vietnam's rainy season. It covers the VND 1.45m soft sleeper fare, booking on dsvn.vn against 12Go, Baolau and Vexere, cabin conditions, the four hours lost near Hue, and what I would change.

Written in September 30, 2026by Lê Minh Đức4 min readCentral Vietnam
Share
A train crosses a historic metal bridge over water in Vietnam at sunset.
A train crosses a historic metal bridge over water in Vietnam at sunset. — Photo by Bảo Minh on Pexels

Related reading

Keep exploring Vietnam

Advertisement · In-article · Fluid

At a glance

Best time
Dry months on the central coast; September to November is the rainy season and the delay window covered in this report
How long
Hanoi to Da Nang is scheduled at 16 hours; my 26-27 September 2026 SE4 took 20
Budget
VND 1,450,000 for a soft sleeper lower berth Hanoi to Da Nang; Ho Chi Minh City to Hanoi soft sleeper runs VND 1.8-2.6m
Getting there
Book on dsvn.vn for a QR e-ticket, or through 12Go, Baolau and Vexere at a markup; passport check at Hanoi station
Language
Vietnamese; on-board announcements repeat in English on some services only
Currency
Vietnamese dong (VND); bring cash for platform stalls and anything bought on board

Booking Vietnam trains: dsvn.vn versus 12Go, Baolau and Vexere

I booked on dsvn.vn, the Vietnam Railways site, and paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin on SE4, which left Hanoi on 26 September 2026. The site issued an e-ticket with a QR code to my email within minutes of payment. At Hanoi station, staff scanned the code on my phone screen at the gate. A printed copy was not needed for this ride, though I screenshotted the QR before leaving the hotel in case the signal dropped near the platform. Passport details go in at booking and the name on the ticket has to match the passport you carry.

12Go, Baolau and Vexere sell the same berths with a markup, and they often hold inventory that dsvn.vn shows as sold out. Before booking direct, I checked 12Go for the same SE4 lower berth and saw a higher price. The markup buys language support and, for some travellers, a payment route that works when the official site does not. Foreign-card acceptance on the official app was one detail I could not confirm before travelling. If your card fails at checkout, the same berth is usually still available through an agent at a higher price.

Book 30-60 days ahead in normal weeks, and 60-90 days ahead if the trip touches Tet. Fares are dynamic, so the VND 1,450,000 I paid is a record of one 2026 booking, not a fixed tariff. The same cabin on a busier date can cost more, and demand spikes around public holidays and the September to November rainy season, when rerouting becomes likelier. Check dsvn.vn for the current price on your date rather than budgeting from any published figure, including mine.

ChannelTypePrice for the SE4 lower berthWhat you get
dsvn.vnVietnam Railways official siteVND 1,450,000 paid for 26 September 2026QR e-ticket by email, scanned at the Hanoi gate
12GoAgentHigher than dsvn.vn, amount varies by date and cabinEnglish support, often holds inventory the official site shows as full
BaolauAgentHigher than dsvn.vn, amount varies by date and cabinSame berths resold with a markup
VexereAgentHigher than dsvn.vn, amount varies by date and cabinSame berths resold with a markup
Where the same SE4 Hanoi to Da Nang berth was sold, checked against one September 2026 booking
  1. Check dsvn.vn first

    Compare the live fare on your date before looking at any agent. The official price for my SE4 lower berth was VND 1,450,000.

  2. Book 30-60 days ahead, or 60-90 for Tet

    Fares are dynamic and berths on the Hanoi to Da Nang run fill faster than hard seats.

  3. Keep an agent as a fallback

    If your foreign card fails on the official site, the same berth is usually still listed on 12Go, Baolau or Vexere at a higher price.

  4. Screenshot the QR e-ticket

    Staff scanned the phone screen at the Hanoi gate on my ride. A printed copy was not required.

Advertisement · Half-page · 300×600

Hanoi station, 26 September 2026: passport check and boarding

The passport check at Hanoi station happens before the platform gate, at a desk where staff match your passport against the name printed on the ticket. Foreign passports join the same queue as Vietnamese ID cards, and that one line is the slowest part of the final hour. Arrive an hour early if you can: the queue that moves steadily at 45 minutes out stops moving entirely in the last 20, while the platform empties around you. My SE4 to Da Nang left Hanoi on 26 September 2026 and covered 791 km in 16 hours scheduled; flooding near Hue stretched it to 20 hours actual. Boarding itself was never the problem.

Carriage and berth numbers are printed on the ticket, so there is nothing to guess or decode on a board. Boarding runs from one platform at Hanoi, and staff point you toward the right door as you walk down. I showed the ticket twice, once at the gate and once at the carriage door, and both times a glance was enough.

Cash matters from this point until you reach Da Nang. I paid for every platform snack, bottle of water, and onboard meal in dong, and I did not try a card again until I was off the train. Small notes matter more than large ones, because change comes slowly at a busy kiosk.

Luggage is not weighed at Hanoi, which is worth knowing if you have read warnings about vietnam trains sleeper services. Two bags fitted under the lower berth, the storage a 4-berth cabin gives each passenger. Carriage lights stay on low all night, and earplugs did more for my sleep than anything else I packed. I paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin, booked on dsvn.vn about six weeks ahead.

Black and white view of a sleeper train compartment with luggage, evoking travel and adventure.
Black and white view of a sleeper train compartment with luggage, evoking travel and adventure. — Photo by Er.Shyama Charan Prasad on Pexels

Vietnam trains sleeper classes: what the VND 1,450,000 berth includes

I paid VND 1,450,000 for a lower berth in a soft sleeper 4-berth cabin on SE4, which left Hanoi on 26 September 2026 and arrived in Da Nang on 27 September 2026. The cabin holds four berths, two lower and two upper, and has a door that closes. I booked lower and would book lower again, for the headroom and because the window sits at that level. The run is 791 km, scheduled at 16 hours, and you spend enough of it in the cabin that which berth you take matters.

Bedding is included in the fare. Each berth came with a mattress, a pillow, a sheet and a blanket, all folded and sealed. I had packed a sleeping bag for the journey and never opened it. The blanket was enough for the air conditioning, which ran cold through the night.

Power was the weak point. I charged my phone from my own power bank for the whole trip rather than depending on the carriage socket. Over 20 hours of actual travel time, that was the right call. Toilets sit at the end of each carriage and are shared by passengers in that carriage. Of everything in my bag, wet wipes and tissue got used more than anything else I packed.

I carried food and cash and did not count on buying meals on board. Over a 20-hour run that was the right decision, and it matches the booking advice to bring your own supplies. Cash was useful at the stops and for anything bought from the platform. If you want to compare this against the longer southern leg, soft sleeper on Ho Chi Minh City to Hanoi runs VND 1.8-2.6m and hard sleeper VND 1.2-1.8m, where the same bedding and cabin logic applies.

ItemWhat the fare covered
Berth bookedLower berth, soft sleeper 4-berth cabin
Fare paidVND 1,450,000
BeddingMattress, pillow, sheet and blanket provided
PowerCarriage socket available; I charged from my own power bank
ToiletsAt the end of each carriage, shared with the neighbouring cabin
MealsNot relied on; I brought my own food and cash
What the VND 1,450,000 soft sleeper lower berth included, SE4, 26-27 September 2026

Four hours late: slow orders near Hue

SE4 left Hanoi on 26 September 2026 and reached Da Nang the next day, 20 hours after departure against a 16-hour schedule for the 791 km run. I paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin. Nobody announced a four-hour delay. The train lost time in small pieces, which is how storm-season disruption usually arrives on vietnam trains.

The delay built south of Hue, where slow orders held the train on sections the flood water had touched. A slow order is the standard railway answer after flooding: the train runs at reduced speed over track that has been checked but not cleared for normal running. Announcements came in Vietnamese first and another language second, and sometimes only in Vietnamese. The station board at Hue carried the updated running, so I checked the board instead of waiting for a translation.

Vietnam Railways buses passengers around blocked track when a section closes. On this ride the train kept moving at reduced speed and no bus transfer happened. Official notices about closures and rerouting appear on dsvn.vn and on station boards, and a bus transfer would be announced there. If you book through 12Go, Baolau, or Vexere, check whether the agent passes disruption notices to you, because the e-ticket QR on your phone does not carry them.

I had left a full day before a Da Nang hotel booking, which absorbed the four hours. The same delay would have broken a same-day flight connection, and I would have been buying a new ticket at Da Nang airport. The lesson carries to the longer run: Ho Chi Minh City to Hanoi is 33-35 hours scheduled, 36-42 hours realistic, with soft sleeper fares at VND 1.8-2.6m and hard sleeper at VND 1.2-1.8m. Book 30-60 days ahead, or 60-90 days ahead for Tet, and treat the arrival time as an estimate between September and November, when central Vietnam's rainy season brings landslides and flooding.

JourneyScheduledActual or realistic
Hanoi to Da Nang (791 km)16 hours20 hours on 26-27 September 2026
Ho Chi Minh City to Hanoi33-35 hours36-42 hours
Scheduled running times against real times on Vietnam's north-south line.
  1. Read the station board, not only the loudspeaker

    Announcements run in Vietnamese first and English second, and sometimes only in Vietnamese. The board at each stop carries the updated running.

  2. Ask about a bus transfer before you leave the station

    Vietnam Railways buses passengers around blocked track when a section closes. If you decide to finish the trip by road on your own from Hue or Da Nang, that replacement transport is your cost.

  3. Keep cash, food, and a charged power bank within reach

    A four-hour slip pushes meals and stops later than planned. Sleeper bedding is included in the fare; the essentials you packed for the delay are not.

  4. Confirm fare and refund rules on dsvn.vn

    Dynamic pricing means the fare you see today may differ tomorrow, and compensation for a missed segment is not guaranteed. dsvn.vn is the official source for both.

Vietnam trains reviews against the numbers: long-haul times and fares

If you are budgeting the long south-to-north trip, the Ho Chi Minh City to Hanoi run is scheduled at 33-35 hours and realistic at 36-42 hours between September and November. That extra time is the rainy season in central Vietnam, when landslides and flooding put slow orders on the line. My leg on SE4 covered 791 km from Hanoi to Da Nang in 20 hours against a 16-hour timetable. Nothing about that gap was unusual for the season. The 33-35 hour schedule only holds on a clean run.

Soft sleeper on Ho Chi Minh City to Hanoi runs about VND 1.8-2.6m depending on the date, and hard sleeper about VND 1.2-1.8m. Bedding is included in both. For comparison, I paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin on Hanoi to Da Nang. I did not travel in a hard sleeper, so those figures are published ranges rather than my own receipts.

Vietnam trains on this line are numbered SE1 to SE8, and the number tells you which timetable slot you are on, not what you pay. SE4 was my train. Vietnam trains reviews of the route tend to complain about delays rather than cleanliness, and the bedding, air conditioning and toilets in my carriage matched what the reviews describe as normal.

Dynamic pricing means these numbers move with the date, so check dsvn.vn for the day you want before you set a budget. Book 30-60 days ahead, and 60-90 days ahead for Tet. When a storm blocks the track, Vietnam Railways buses passengers around the closed section, so leave a day of slack before an onward flight and confirm the rerouting and refund rules on dsvn.vn first. The official e-ticket QR is scanned at the gate, and staff check passports at the station.

RouteClassFare (VND)ScheduledRealistic
Hanoi to Da NangSoft sleeper, 4-berth lower berth1,450,000 (paid 26 Sept 2026)16 hours20 hours
Ho Chi Minh City to HanoiSoft sleeper1.8-2.6m33-35 hours36-42 hours
Ho Chi Minh City to HanoiHard sleeper1.2-1.8m33-35 hours36-42 hours
Fares and journey times for the Reunification Express, including the berth I paid for on 26 September 2026.

What I would change on the next ride

I paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin on SE4. Hanoi to Da Nang is 791 km, scheduled at 16 hours; we took 20 hours on 26-27 September 2026. Sleeping through the extra four meant I reached Da Nang functional rather than wrecked. The lower berth also gets the window and the space underneath for a bag you would rather not lift overhead at 2am. I would pay the same and ask for the same bunk next time.

Carry more cash than you expect to need. dsvn.vn took my card for the ticket, but platform stalls, drinks and everything bought on board were cash only, and I was down to about VND 200,000 by Da Nang. On the longer Ho Chi Minh City to Hanoi run, where soft sleeper fares run VND 1.8-2.6m and hard sleeper VND 1.2-1.8m, that buffer matters even more.

Slow orders near Hue added four hours, so I would leave a full day of slack after arrival. On the full Ho Chi Minh City to Hanoi run, 33-35 hours scheduled turns into 36-42 hours realistic between September and November, so a full day of slack is safer.

  • 1.Pay for the lower berth

    The VND 1,450,000 covered the difference between sleeping and sitting up, and the lower berth has the window and the under-berth luggage space.

  • 2.Carry more cash, expect less from cards

    dsvn.vn took the payment online, but platform stalls, drinks and anything bought on board were cash only for me.

  • 3.Add 12 hours of slack after arrival

    A four-hour delay from slow orders near Hue eats a tight connection to a flight, a bus or a booked transfer out of Da Nang.

  • 4.Pack earplugs, power bank, wet wipes and tissue

    Bedding is supplied in a soft sleeper. The rest is not, and the carriage lights stay on low overnight.

  • 5.Recheck dsvn.vn on the day of travel

    Storm timetable changes appear close to departure on dsvn.vn and on station boards, not when you booked weeks earlier.

Dramatic flood scene with palm trees submerged in Phú Yên, Vietnam
Dramatic flood scene with palm trees submerged in Phú Yên, Vietnam — Photo by Long Bà Mùi on Pexels

Vietnam trains in storm season: refunds, rerouting and where notices appear

## Vietnam trains in storm season: refunds, rerouting and where notices appear

Vietnam Railways publishes storm timetable changes on dsvn.vn and posts the same notice on station boards, so those two places show a closure before any agent emails you. On my ride, SE4 left Hanoi on 26 September 2026 and reached Da Nang on 27 September 2026 with no closure at all: the train ran slow, 20 hours against a scheduled 16 hours for the 791 km, after flood-related slow orders south of Hue.

When track does close, the railway buses passengers around the blocked section and the train picks up on the far side. That did not happen on my ride; slow orders were enough to eat four hours. Rainy season in central Vietnam runs September to November, and flooding and landslides cause the delays on this route. Both tend to hit south of Hue first, which is why the stretch between Hue and Da Nang is where a schedule usually slips.

I could not confirm what Vietnam Railways pays for a missed segment in 2026, or whether any compensation is automatic. Ask at the station counter rather than assuming, and keep the e-ticket QR from your booking, because that is the reference staff use. Whether the official site takes foreign cards in 2026 is also unverified, so carry cash. If you booked on 12Go, Baolau or Vexere, those agents handle refunds on their own timelines, which is slower than dealing with dsvn.vn directly.

Vietnam trains on the north-south line take 33-35 hours scheduled from Ho Chi Minh City to Hanoi, and 36-42 hours realistically. A storm delay can push you past a fixed onward flight or bus, so leave a day of slack after arrival. Check dsvn.vn and the board at your station before departure, not an agent's app.

  1. Check dsvn.vn and the station board first

    Storm changes appear there before they reach any third-party booking site. Do this the day before departure and again on arrival at the station.

  2. Keep your e-ticket QR and booking reference

    Counter staff use the QR as the reference for rebooking, rerouting or a refund request. Screenshot it in case the network drops.

  3. Ask about missed-segment compensation at the counter

    Compensation rules for 2026 are unconfirmed, including whether payment is automatic. Ask in person and keep the receipt if you pay anything extra.

  4. Contact your agent if you booked through one

    12Go, Baolau and Vexere process refunds on their own timelines, which is slower than dealing with dsvn.vn directly.

  5. Leave slack before onward travel

    Flooding and landslides south of Hue can add four hours or more. Avoid same-day connections after a long overnight run.

Frequently asked questions

No. My SE4 on 26-27 September 2026 took 20 hours against a 16-hour schedule because of slow orders near Hue. September to November brings flooding and landslides in central Vietnam. On the long haul, Ho Chi Minh City to Hanoi is scheduled at 33-35 hours and runs 36-42 hours in practice.

dsvn.vn is the Vietnam Railways site and issues a QR e-ticket. Agents 12Go, Baolau and Vexere sell the same berths at a markup. Book 30-60 days ahead in normal weeks, 60-90 days ahead if your trip touches Tet.

I paid VND 1,450,000 for a soft sleeper lower berth in a 4-berth cabin, Hanoi to Da Nang, on 26 September 2026. On the Ho Chi Minh City to Hanoi route, soft sleeper runs about VND 1.8-2.6m and hard sleeper about VND 1.2-1.8m. Fares are dynamic, so check dsvn.vn for your date.

Vietnam Railways can bus passengers around the closed section, and notices go up on dsvn.vn and on station boards. On my ride the train kept moving at reduced speed and no bus transfer happened. I could not confirm the exact compensation for a missed segment, so ask at the station counter and keep your ticket QR.

Travel details change — opening hours, prices, and schedules can vary by season. Please verify current information on official websites before your visit.

Watch: related videos

Vietnam Trains in Storm Season: Reunification Express SE4 Hanoi to Da Nang, 26-27 September 2026 — Video by Clifford Coulter on Pexels · silent stock clip

Vietnam Trains in Storm Season: Reunification Express SE4 Hanoi to Da Nang, 26-27 September 2026 — Video by Chó Và Mèo on Pexels · silent stock clip

Sources

Loading reviews…

About the author

Lê Minh Đức

Routes & Itineraries Editor

Minh Đức plans Vietpeep's itineraries, transport guides, and practical tips with a surveyor's care for distances, timings, and connections. He believes a route is only as good as its smallest detail — the last ferry, the right train class, the turn travelers miss.

All articles by Minh Đức
Advertisement · After article · Responsive

Related posts

Advertisement · Mobile sticky · Anchor